Paseo de la Castellana 123
28046 Madrid, Spain
Innovation & Business Development
🔬 R&D Center - Seville
Parque Tecnológico Cartuja
41092 Seville, Spain
Research & Development
🏭 Demo Facility - Alicante
Polígono Industrial Las Atalayas
03114 Alicante, Spain
Live System Demonstrations
Frequently Asked Questions
How quickly can Aqua Brain systems be deployed?+
Our modular systems can be deployed within 3-6 months from contract signing. This includes site preparation,
installation, commissioning, and staff training. For pilot programs, we can have a demonstration system
operational within 8-12 weeks.
What size installations does Aqua Brain support?+
Our systems are modular and scalable from 50 to 8,000 m³/day. We specialize in small-to-medium scale
installations perfect for municipalities (10,000-100,000 residents), agricultural operations, and industrial
facilities. Multiple units can be combined for larger capacity needs.
What are the maintenance requirements?+
Thanks to our AI-powered predictive maintenance, Aqua Brain systems require 60% less maintenance than
traditional desalination plants. The system operates 90% autonomously, with most maintenance scheduled
during optimal times. We offer comprehensive service contracts including 24/7 remote monitoring and support.
How does Aqua Brain integrate with renewable energy?+
Our systems are designed for seamless integration with solar and wind energy. The AI optimizes operations
based on renewable energy availability and weather forecasts, achieving up to 100% renewable operation during
optimal conditions. Battery storage ensures continuous operation.
What financing options are available?+
We offer flexible financing including direct purchase, leasing, and performance-based contracts. Spanish
municipalities benefit from ENISA certification providing procurement preferences. We also assist with EU
grant applications and work with ICO for equipment financing. Contact us for customized financing solutions.